EXPRESS DAM comment resolution

Dave Loffredo loffredo at steptools.com
Tue May 7 11:35:54 EDT 2002


>>>>> "Phil" == Phil Spiby <Phil.Spiby at eurostep.com> writes:

Phil> I have not been able to create a detailed list of the edits
Phil> required (I'll leave that to the editor to sort out!). However,
Phil> I think given the comment response document, and the original
Phil> DAM document it is relatively painless to work out the intent of
Phil> the changes required.

As you move forward with updating the document, just a reminder the
annex containing the mapping from E2 to E1 needs to be circulated as
soon as it is ready.

Since the Annex is normative and contains technical material that has
not been balloted, SC4 adopted action item #94 that directs WG11 to
circulate the draft annex to the P-members, in parallel with internal
WG11 review, prior to any signoff for FDIS ballot.

						- Dave


--
Dave Loffredo (loffredo at steptools.com)
STEP Tools Inc. / 216 River Street / Troy, New York 12180-3810 USA
(518) 687-2848 x311 (voice) / (518) 687-4420 (fax) 




More information about the wg11 mailing list