Minutes of 9th AP-238 testing telcon
st-announce at steptools.com
st-announce at steptools.com
Sun Jan 30 19:53:37 EST 2005
Minutes of the AP-238 CC1 Testing Telcon on January 28th.
---------------------------------------------------------
The STEP files from the four CAM systems have been tested on the two controls. The remaining issue is the Mastercam file which is metric units. NIST will translate these units to inches before the demonstration.
The two simulators have been shipped to the conference hotel.
There are two components in the demonstration. A writer component is added to the CAM system to write out the CAM data as an AP-238 file without using a post. A converter component runs on the control and converts the AP-238 toolpaths to the TCP motion codes understood by the control.
The key difference between the new method and the old is that the data is sent to the control as tool path movements organized into a set of operations, not axis movements organized into a stream of codes. This makes the data more portable and has the following consequences.
1. Simulators can be added to the control to verify the paths
and reduce prove-out time.
2. An enterprise can start using a new CAM system without having
to develop new post-processors.
3. The new pathway between the CAM and the CNC is considerably wider
and more functional than the old and over time many new
optimizations can be developed to reduce machining time and data
preparation time.
4. Customers have many more ways to monitor the processes a shop
uses to machine a part and can considerably reduce their costs
for process monitoring and quality control.
Action Items
------------
* The team will assemble at 4PM on Wednesday to begin testing.
* Sid Venkatesh will arrange meetings with the control vendors
to discuss business issues.
* NIST will develop an inch version of its CDS model.
* Everybody should think about the scope of the next
demonstration.
Meeting Attendees:
Fred Proctor NIST
Sid Venkatesh and Mauro Costas, Boeing Seattle
Ming Lui, Waris Jaffrey, Boeing Wichita
David Odendahl Boeing Tulsa
John Witco, Carol Tierney, GDLS
John Callen, GibbsCAM
Chen Han Lee, UGS
Mark Cote, Pratt and Whitney
Martin Hardwick and David Loffredo STEP Tools
Apologies for absence:
Donald Trotter, Siemens
The next meeting will be in person in Orlando, Florida on February 4th and 5th.
As recorded by Martin Hardwick on January 28, 2004.