<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    Martin Hardwick, STEP Tools, USA
    <br>
    David Loffredo, STEP Tools, USA
    <br>
    Sid Venkatesh, Boeing, USA
    <br>
    Bob Ericksson, P&W, USA<br>
    Liming Li, JSL Innovations, USA
    <br>
    Larry Maggiano, Mitutoyo, USA
    <br>
    John Horst, NIST USA
    <br>
    Gordon Shao, NIST, USA
    <br>
    Vincent Marchetti, Ameritech, USA
    <br>
    Udo Herbes, DMG, USA
    <br>
    Michael Kirbach, DMG Germany
    <br>
    Sandra Haege-Betz, adVANCE 3D, Germany
    <br>
    Alain Brail, Airbus (reitred), France<br>
    Christian Callet, Datakit, France<br>
    John Bijnens, KU Leuven, Belgium
    <br>
    Mikael Hedlind, Scania, Sweden
    <br>
    Bengt Olssen, Sandvik, Sweden
    <br>
    Rudi Grutke, Iscar, Israel
    <br>
    Junghorn Cho, Hyundai, Korea <br>
    Chris Rezny, Hyundai, USA
    <br>
    Clinton Christian, Renishaw, Canada
    <br>
    <br>
    We discussed the digital twin models that have been put onto the
    public cloud site in Montreal.
    <br>
    <br>
    <a class="moz-txt-link-freetext"
      href="http://fishhead.steptools.com:8081/">http://fishhead.steptools.com:8081/</a>
    (Stage 1 - Okuma)
    <br>
    <a class="moz-txt-link-freetext"
      href="http://fishhead.steptools.com:8082/">http://fishhead.steptools.com:8082/</a>
    (Stage 2  - Hyundai)
    <br>
    <a class="moz-txt-link-freetext"
      href="http://fishhead.steptools.com:8083/">http://fishhead.steptools.com:8083/</a>
    (Stage 3  - Makino)
    <br>
    <a class="moz-txt-link-freetext"
      href="http://fishhead.steptools.com:8084/">http://fishhead.steptools.com:8084/</a>
    (Stage 4  - DMG)
    <br>
    <br>
    No issues were found and we agreed that the next task should be
    testing against MTConnect streams from dry run and wet run
    machining.
    <br>
    <br>
    We discussed the face to face meeting on July 25th and agreed that a
    technical demonstration is necessary so the meeting will be held in
    the lab at Boeing in Renton.
    <br>
    <br>
    A draft agenda is attached. The draft includes a second meeting on
    the 26th to discuss pilot projects for 2019.<br>
    <br>
    We admired the banner shown below. Questions were raised about the
    role of the lightning bolts, the choice of the logos, and the length
    of the name. We agreed to ask for suggestions from professionals.<br>
    <br>
    <img src="cid:part5.E3F473DE.59756EEB@steptools.com" alt=""><br>
    <br>
    There will be no meeting next week because of the July 4th holiday.
    The next meeting will be held at the regular times on July 11th.
    <br>
    <br>
    Martin Hardwick
    <br>
    Convener Digital Manufacturing
  </body>
</html>