<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body bgcolor="#FFFFFF" text="#000000">
Attendees <br>
-------------- <br>
Martin Hardwick, STEP Tools, USA <br>
David Loffredo, STEP Tools, USA<br>
Bengt Olsson, Sandvik, Sweden <br>
Julie Huang, Sandvik, Sweden
<br>
Mike Restall, Sandvik, USA <br>
David Odendahl, Boeing, USA <br>
Sid Venkatesh, Boeing, USA<br>
Alain Brail, Airbus (retired), France<br>
Hubert Ekongolo, Aix-Marseille University, France<br>
Jim Kosmala, Okuma, USA<span style="color:windowtext"><br>
</span><span style="color:windowtext">Thanh Huynh, </span>Okuma,
USA<span style="color:windowtext"><br>
Bob Baldizzi, </span>Okuma, USA<span style="color:windowtext"><br>
Tom Raun, Iscar, USA<br>
</span><br>
We reviewed the new HardMoldy data. We identifies issues with
respect to the Boeing process data, and the depth of cut for a
profile in the Sandvik data. The Iscar data has become faster
because it is using better Mastercam algorithms. <br>
<a class="moz-txt-link-freetext" href="ftp://www.steptools.com/private/CAM_exchange/Cycle_4/v3_IMTS_HARDMOLDY.zip">ftp://www.steptools.com/private/CAM_exchange/Cycle_4/v3_IMTS_HARDMOLDY.zip</a><br>
<br>
We learned that a new Catia translator is becoming available that
includes semantic tolerance data. We agreed that Okuma will supply a
STEP model of their fixture and we identified an issue in the
machine tool kinematics for the Genos m560.<br>
<br>
We agreed that the process requirement data belongs on the workplan
and should be added to the HardMoldy data because it shows the
requirements that are being met by the process optimization.<br>
<br>
We briefly discussed how to relate the run time process parameter
data for the control available in the Thinc API to the STEP-NC data
shown in the STEP-NC Explorer and will explore this interfacing in
greater depth in the next conference call.<br>
<br>
We will hire a conference room for each day of IMTS so that we can
explain the demonstration in greater detail. We are working on
creating pre-show publicity material.<br>
<br>
A recording of the call is on the ftp site. <br>
<a class="moz-txt-link-freetext" href="ftp://www.steptools.com/private/CAM_exchange/Cycle_4/stepmanuf_telecon_20140603.wmv">ftp://www.steptools.com/private/CAM_exchange/Cycle_4/stepmanuf_telecon_20140603.wmv</a><br>
<br>
The next conference call will be held at the regular times on
Wednesday May 11th <br>
<br>
Action Items<br>
-----------------<br>
1. Boeing to prepare a new version of HardMoldy with the semantic
tolerance data<br>
2. STEP Tools to correct the machine tool kinematics for the Genos
M560<br>
3. Okuma to prepare a STEP model for their fixture.<br>
4. Iscar to prepare ISO 13399 assembly data for their cutting tools<br>
</body>
</html>