<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
</head>
<body bgcolor="#ffffff" text="#000000">
<u>Attendees</u><br>
Martin Hardwick, STEP Tools, USA
<br>
David Loffredo, STEP Tools, USA
<br>
Bengt Olsson, Sandvik, Sweden
<small><br>
</small>
Fred Proctor, NIST, USA
<br>
Alain Brail, AlBavis,&nbsp; France
<br>
Mikael Hedlind, KTH, Sweden<br>
Leon Xu, Boeing, USA
<br>
Chris Pfeifer CCAT, USA<br>
David Odendahl, Boeing, USA
<br>
Robert Erikson, Pratt &amp; Whitney, USA<br>
Larry Maggiano, Mitutoyo, USA<br>
<br>
<u>Apologies for Absence</u><br>
Anna Valente, ITIA-CNR, Italy<br>
Sid Venkatesh, Boeing, USA<br>
Aydin Nassehi, U.Bath, UK<br>
<br>
We will use the three axis version of the Boxy part for the tool wear
demonstration.<br>
<br>
To run the demonstration we must add curve data to the tool paths for
the cross-section area, axial depths and radial depths. Sandvik will
compute this data using Vericut. <br>
<br>
To verify the computations will measure the cutting force during
machining using a Dynamometer. NIST will investigate whether one can be
made available with an MTConnect interface.<br>
<br>
To show tool wear during the demonstration we must machine at high
speed using a hard material. There was concern about the cost of
Titanium but it is the most relevant material for the aerospace
industry.<br>
<br>
We were unable to discuss the process planning demonstration due to
snow in the UK.<br>
<br>
We reviewed the testing history slides and additions were made to the
list of participants for the Springfield and Toulouse demonstrations.
There was a request to add additional material to the slides in the
form of notes and to show system diagrams for more of the
demonstrations. A new version of the slides has been posted. (Warning
the pdf version has a minor page size issue)<br>
<br>
<a class="moz-txt-link-freetext" href="ftp://ftp.steptools.com/private/NIST/Testing_history.pptx">ftp://ftp.steptools.com/private/NIST/Testing_history.pptx</a><br>
<a class="moz-txt-link-freetext" href="ftp://ftp.steptools.com/private/NIST/Testing_history.pdf">ftp://ftp.steptools.com/private/NIST/Testing_history.pdf</a><br>
<br>
Additional material on the history of our STEP-NC testing is on the
STEP Tools web site (see the box on Milestones).<br>
<br>
<a class="moz-txt-link-freetext" href="http://www.steptools.com/library/stepnc/">http://www.steptools.com/library/stepnc/</a><br>
<br>
There is also a description of early testing by other groups in the
following document.<br>
<br>
<a class="moz-txt-link-freetext" href="ftp://ftp.steptools.com/private/NIST/wg3n2098_ap238_validation-1.pdf">ftp://ftp.steptools.com/private/NIST/wg3n2098_ap238_validation-1.pdf</a><br>
<br>
The next call will be at the regular times on Wednesday January 20th.
We apologize for not making a video of the call due to Sweden being on
vacation.<a class="moz-txt-link-freetext"
 href="ftp://ftp.steptools.com/private/NIST/stepmanuf_telecon_20091216.wmv"></a><br>
<br>
Martin Hardwick<br>
Team Leader STEP-Manufacturing<br>
<br>
Action Items<br>
----------------<br>
Sandvik to computer cross-section, axial depth and radial depth curve
data for the three axis version of Boxy.<br>
<big><small>NIST to determine the availability of a dynamometer with an
MT Connect interface.<br>
Boeing to evaluate what material to use for the demonstration.</small><br>
</big>
</body>
</html>