Attendees<br>
---------------<br>
Alain Brail, Airbus, France<br>
John Horst, NIST<br>
Ray Admire, Lockheed Martin<br>
David Odendahl, Boeing<br>
Curtis Brown, Honeywell Kansas City Plant<br>
Fred Proctor, NIST<br>
Bengt Olsson, Sandvik, Sweden<br>
Mikael Hedlind, KTH, Sweden<br>
Matthew Lloyd, CCAT<br>
Larry.Maggiano, Mitutoyo<br>
Xia Li, RPI<br>
Don Galway, AIAG<br>
Julio Garrido, U Vigo, Spain<br>
Martin Hardwick, STEP Tools, Inc.<br><br>
<br>
Apologies for absence<br>
--------------------------------<br>
James Ayers, Northrop Grumman<br>
Xun Xu, New Zealand<br><br>
<br>
The latest data is
at:ftp://www.steptools.com/private/Dallas/20071017_data/<br><br>
There are three AP-238 data sets:<br><br>
Dallas_Sandvik2.238<br>
Dallas_Boeing.238<br>
Dallas_Boeing_andSandvik.238<br><br>
The last file combines the first two using a STEP-NC Selective. A
machining organization can choose between the two workplans in this
selective and then inspect the result using the common inspection
plan.<br><br>
The Sandvik data has been machined. Images of the part after both the
roughing and finishing can be found on the ftp site. Videos of the
machining and on-machine inspection are in the videos sub-directory. The
times for the machining are as follows:<br><br>
<font size=2>3-axis machining (9.5 minutes):</font> <br>
<font size=2>&nbsp;-1st rough (44mm diameter tool), 6.5 minutes at
n=7958rpm and vf=8356mm/min</font> <br>
<font size=2>- 2nd rough (20mm diameter tool), 3 minutes at n=7958rpm and
vf=2858mm/min</font> <br><br>
<font size=2>5-axis machining (35.5 minutes):</font> <br>
<font size=2>-semi finish (16mm diameter, 4mm radius), 19 minutes at
n=10,000rpm and vf=1,974mm/min</font> <br>
<font size=2>-finish, (16mm diameter, 4mm radius) 16.5 minutes at
n=10,000rpm and vf=1,974mm/min</font> <br><br>
This is much faster than the Ibusuki demonstration because of the larger
tools. The main directory contains Fanuc (3-axis) and Heidehain 5-axis
codes for the machining and a DMIS file for the inspection.<br><br>
There was an extensive discussion of the inspection issues on both the
CMM and the CNC. For the CNC it was decided to use the Heidenhain macro's
to probe the round hole. For the CMM inspection it was decided to run the
CMM in DMIS Program mode. More data has to be added to the DMIS program
to enable a complete analysis of the measurement results. The STEP-NC
team will work with the HiPP team until all the required information has
been extracted from the AP-238 file. Where items are missing they will be
identified so that the can be added to HiPP extensions for Edition 2 of
AP-238.<br><br>
Boeing has partially converted its tool paths to STEP-NC and is
optimistic that it will be able to machine the part before the
demonstration. NIST has scheduling difficulties and will only be able to
complete the 3-axis roughing operation before the demonstration.<br><br>
<br>
Schedule<br>
--------------<br>
November 1st&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; - Machining
demonstration<br>
October 24th&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; - Finish
machining tests<br>
October 10th&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; - Begin
machining tests<br>
October 1st&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -
Finish tool path development<br>
September 15th&nbsp;&nbsp;&nbsp;&nbsp; - Begin tool path
development<br><br>
<br><br>
New Action Items<br>
--------------------------<br>
Change the Heidenhain export to use a probing macro for the
round-hole.<br>
Complete the information in the DMIS export required to enable a full
analysis of the inspection results on the CMM.<br><br>
<br><br>
Closed Action Items<br>
-----------------------------<br>
Martin Hardwick to send AP-203 file for the fish head to Len
Slovensky<br>
Len Slovensky to prepare a draft AIC for the inspection features<br>
David Odendahl to contact Chen Han Lee of UGS and John Horst to contact
John&nbsp; Schafer of UGS about participating in the demonstration<br>
Fred Proctor to investigate use of Pro/Manufacturing for developing fish
head tool paths<br>
Martin Hardwick to contact Prof. Kisinami about Far East participation in
the demonstration<br>
Alain Brail to contact Renishaw about using their macros for two
dimensional (X and Y) probing<br>
Martin Hardwick to send Catai data for the Ibusuki demonstration to Shaw
Feng<br>
Len Slovensky to investigate developing an AP-224 file with the
tolerances for the fish head part as a substitute AP-203 e2 file<br>
Fred Proctor to prepare a welcome package for new organizations that want
to join the demonstration<br>
Fred Proctor to develop a scenario for the demonstration showing data
flows and responsibilities<br>
John Horst to assist Ray Admire in contacting the Mori-Seiki tech
center<br>
Bengt Olsson to investigate requirements for optimal tool selection<br>
Chen-Han Lee to assist Bengt Olsson in converting the Sandvik rough model
to AP-203<br>
Shaw Feng and HiPP team to review the inspection features suggested by
Airbus<br>
Curtis Brown to develop a recipe for making the new measurements on the
part<br>
John&nbsp; Horst to contact Len Slovensky about developing an AP-203 e2
model with the tolerances required by the new measurements<br>
Martin Hardwick to develop an AP-238 model with the new tolerances and
measurements<br>
David Odendahl and Ray Admire to contact Vought about hosting the
demonstration<br>
Alain Brail and John Horst to contact Renishaw about participating in the
demonstration<br><br>
<br><br>
This was the last conference call before the meeting on October 31st and
November 1st<br>