[step-manufacturing] Summary of Digital Twin use case telecon on June 16

Martin Hardwick hardwick at steptools.com
Wed Jun 17 15:54:07 EDT 2020


 1. We agreed to use the new schedule (attached) which completes the
    work by August 25 when the ballot comment resolution is predicted to
    start.
 2. We discussed how to simplify the three demonstrations for this new
    deadline and produced the outlines shown below.

In the next conference call on June 23 (connection data repeated below) 
we will look at the information flows required to the support these 
three scenarios.

+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

Robot drill and fill demonstration

 1. Part arrives as off-nominal in AP242
 2. Automate adjustment of AP238 process
 3. We kill Kenny (i.e one of the robots stops working)
 4. Automate adjustment of AP238 process
 5. Emulate one of the robots drilling holes
 6. Communicate results as MTConnect
 7. Deliver AP242 result of new configuration

Tool life optimization

 1. Run the Hermle in KTH lab
 2. Send out signals when Workingsteps start and finish
 3. Make a database of completed operations
 4. Derive a view of the work done by each tool
 5. Test the value of the digital twin model of AP238 edition 2

Airframe weight reduction

 1. AP242 models showing nominal height of three plys in an assembly
 2. Electronic calipers measure actual height and report as QIF (and
    MTConnect)
 3. Digital twin modeler reads QIF and adjusts nominal to actual
 4. Perform measurements for 3 different combinations
 5. Report actual stack height of the 3 assemblies by sending AP242
    model to Lockheed CAD

++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Topic: ISO 23247 digital twin use cases
Time: Jun 23, 2020 09:30 AM Eastern Time (US and Canada)
     Every week on Tue, until Aug 25, 2020, 10 occurrence(s)
     Jun 23, 2020 09:30 AM
     Jun 30, 2020 09:30 AM
     Jul 7, 2020 09:30 AM
     Jul 14, 2020 09:30 AM
     Jul 21, 2020 09:30 AM
     Jul 28, 2020 09:30 AM
     Aug 4, 2020 09:30 AM
     Aug 11, 2020 09:30 AM
     Aug 18, 2020 09:30 AM
     Aug 25, 2020 09:30 AM
     Please download and import the following iCalendar (.ics) files to 
your calendar system.
     Weekly: 
https://iso.zoom.us/meeting/tJYscOquqzIoE9TA9dRFsXyMt8HOPN7wDH91/ics?icsToken=98tyKuCqrzwpHNGcshCHRowQBY_Cb-7wmFhBj_ppvUbhMQZAWhrbIrpqHYJRR8_0

Join from PC, Mac, Linux, iOS or Android: 
https://iso.zoom.us/j/92173659290?pwd=dTVSMnZ4Y3hBWGhXeXV1bHJsRG8zZz09
     Password: 479383

Or iPhone one-tap :
     US: +16468769923,,92173659290#  or +13017158592,,92173659290#
Or Telephone:
     Dial(for higher quality, dial a number based on your current 
location):
         US: +1 646 876 9923  or +1 301 715 8592  or +1 312 626 6799  or 
+1 408 638 0968  or +1 669 900 6833  or +1 253 215 8782  or +1 346 248 
7799  or 877 853 5247 (Toll Free)
     Meeting ID: 921 7365 9290
     Password: 479383
     International numbers available: https://iso.zoom.us/u/abeSEHDv1f

Or Skype for Business (Lync):
     https://iso.zoom.us/skype/92173659290



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.steptools.com/pipermail/step-manufacturing/attachments/20200617/a3ec6345/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Compressed_Digital_twin_use_case_demos.gif
Type: image/gif
Size: 50668 bytes
Desc: not available
URL: <http://lists.steptools.com/pipermail/step-manufacturing/attachments/20200617/a3ec6345/attachment.gif>


More information about the step-manufacturing mailing list