[step-manufacturing] Summary of Digital Twin use case telecon on June 16
Martin Hardwick
hardwick at steptools.com
Wed Jun 17 15:54:07 EDT 2020
1. We agreed to use the new schedule (attached) which completes the
work by August 25 when the ballot comment resolution is predicted to
start.
2. We discussed how to simplify the three demonstrations for this new
deadline and produced the outlines shown below.
In the next conference call on June 23 (connection data repeated below)
we will look at the information flows required to the support these
three scenarios.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Robot drill and fill demonstration
1. Part arrives as off-nominal in AP242
2. Automate adjustment of AP238 process
3. We kill Kenny (i.e one of the robots stops working)
4. Automate adjustment of AP238 process
5. Emulate one of the robots drilling holes
6. Communicate results as MTConnect
7. Deliver AP242 result of new configuration
Tool life optimization
1. Run the Hermle in KTH lab
2. Send out signals when Workingsteps start and finish
3. Make a database of completed operations
4. Derive a view of the work done by each tool
5. Test the value of the digital twin model of AP238 edition 2
Airframe weight reduction
1. AP242 models showing nominal height of three plys in an assembly
2. Electronic calipers measure actual height and report as QIF (and
MTConnect)
3. Digital twin modeler reads QIF and adjusts nominal to actual
4. Perform measurements for 3 different combinations
5. Report actual stack height of the 3 assemblies by sending AP242
model to Lockheed CAD
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Topic: ISO 23247 digital twin use cases
Time: Jun 23, 2020 09:30 AM Eastern Time (US and Canada)
Every week on Tue, until Aug 25, 2020, 10 occurrence(s)
Jun 23, 2020 09:30 AM
Jun 30, 2020 09:30 AM
Jul 7, 2020 09:30 AM
Jul 14, 2020 09:30 AM
Jul 21, 2020 09:30 AM
Jul 28, 2020 09:30 AM
Aug 4, 2020 09:30 AM
Aug 11, 2020 09:30 AM
Aug 18, 2020 09:30 AM
Aug 25, 2020 09:30 AM
Please download and import the following iCalendar (.ics) files to
your calendar system.
Weekly:
https://iso.zoom.us/meeting/tJYscOquqzIoE9TA9dRFsXyMt8HOPN7wDH91/ics?icsToken=98tyKuCqrzwpHNGcshCHRowQBY_Cb-7wmFhBj_ppvUbhMQZAWhrbIrpqHYJRR8_0
Join from PC, Mac, Linux, iOS or Android:
https://iso.zoom.us/j/92173659290?pwd=dTVSMnZ4Y3hBWGhXeXV1bHJsRG8zZz09
Password: 479383
Or iPhone one-tap :
US: +16468769923,,92173659290# or +13017158592,,92173659290#
Or Telephone:
Dial(for higher quality, dial a number based on your current
location):
US: +1 646 876 9923 or +1 301 715 8592 or +1 312 626 6799 or
+1 408 638 0968 or +1 669 900 6833 or +1 253 215 8782 or +1 346 248
7799 or 877 853 5247 (Toll Free)
Meeting ID: 921 7365 9290
Password: 479383
International numbers available: https://iso.zoom.us/u/abeSEHDv1f
Or Skype for Business (Lync):
https://iso.zoom.us/skype/92173659290
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.steptools.com/pipermail/step-manufacturing/attachments/20200617/a3ec6345/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Compressed_Digital_twin_use_case_demos.gif
Type: image/gif
Size: 50668 bytes
Desc: not available
URL: <http://lists.steptools.com/pipermail/step-manufacturing/attachments/20200617/a3ec6345/attachment.gif>
More information about the step-manufacturing
mailing list