[step-manufacturing] Day 2 schedule and connection information
Martin Hardwick
hardwick at steptools.com
Wed Oct 1 22:27:14 EDT 2008
All,
On the first day of our meeting we milled the
impeller and demonstrated both feed speed
optimization and closed loop machining using STEP-NC.
For our second day we will be discussing how to
improve the standard using the experiences gained
from this demonstration and other demonstrations around the world.
KTH has supplied a GoTo meeting site. Sandvik has
supplied a list of worldwide call in numbers.
The agenda for the second day is shown below.
There has been one title change since yesterday.
The first item for the morning will be a review
of the current status of the technical
corrigendum. The slides to be presented are at:
ftp://ftp.steptools.com/private/CCAT/review_of_stepnc_tc1.ppt
Martin Hardwick
Team Leader STEP-Manufacturing
GoToMeeting site:
Thursday, October 2 at 2:00 PM Västeuropa, normaltid at
https://www2.gotomeeting.com/join/810047196
Meeting ID: 810-047-196
Audio hosted by SANDVIK:
-Dial one of the listed local numbers to join the meeting
USA 1 866 488 7956
Sweden: +46 (0) 8 5051 3879 or 0200 896 296
Germany: +49 (0) 69 71044 5442 or 0800 101 2144
UK: +44 (0)20 7153 9922 or 0800 358 4906
France : +33 (0)1 70 99 43 46 or 0800 941 582
Japan: 0044 2213 2777
(additional local numbers:
<https://filestore.xmr3.com/272575/12949241/shared/GlobalMeetingInformation.pdf>https://filestore.xmr3.com/272575/12949241/shared/GlobalMeetingInformation.pdf)
-Enter Passcode: 959 6745 #
Technical Discussions Day 2 - Thursday October 2nd
08:00AM Review of AP-238 Technical Corrigendum
David Loffredo, STEP Tools, Inc
09:00AM Discussion of open issues
Desirable extensions
New work items
Action items
10:00AM Break
10:30AM Case study; STEP-NC
applied in heavy truck manufacturing
Mikael Hedlind, KTH
Action items
11:00AM Interfacing ISO 13399 and STEP-NC
Action items
Bengt Olsson, Sandvik
12:00PM Lunch
01:00PM Machine tool modeling and simulation issues
Performance and precision requirements
Action items
01:30PM Measurement issues
Curve probing
Automating datum setup
Action items
02:30PM Action items for SC1 meeting
Martin Hardwick, STEP Tools, Inc.
03:00PM Break
03:30PM Plans for next meeting
Location, schedule, technical targets
04:00PM Close of meeting
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.steptools.com/pipermail/step-manufacturing/attachments/20081001/f78006be/attachment.htm>
More information about the step-manufacturing
mailing list